Key:start_date

From OpenStreetMap Wiki
Jump to: navigation, search
Help
Available languages
English 日本語

start_date


Description

date when feature opened or the construction of the feature finished

Group

Properties

Element help

Can be attached on nodesCan be attached on waysCan be attached on areas


start_date=* can be used to indicate the date the feature opened or construction of the feature finished. See end_date=* for the date when availability of the feature ended. These tags are useful when considering Historical mapping.

Formatting

Exact dates

Dates use the ISO 8601 system, which is based on the Gregorian calendar. Be aware that for exact dates there are differences of up to 11 days between the Gregorian and Julian calendars and that different counties switched to the Gregorian calendar over a 400 year period.

Examples:

Caution: ISO8601 uses the format yyyy-mm-dd, not the common North Amerian model of yyyy-dd-mm

Approximations

Often a date will not be known exactly. In which case some of the following can be used:

Notes

'1800s' means the years 1800-1809, not 1800-1899. Prefixes of 'early ', 'mid ', 'late ', 'before ' or 'after ' to indicate those things.

Avoid seasons. For example 'summer 1998' as these vary between the hemispheres. Consider using '1998-05..1998-08' for summer in the northern hemisphere.

BCE can be used in place of BC. AD is assumed where BC is not used but optionally be included.

Avoid multiple entries, for example 2010-08-01;2010-08-19 without providing at least an explanation in a note.

Marking a civilization, period and era

You can also add information by setting the following keys (no need to restrict them to features with a historic=*):

Appendix

Some values drawn from a review of Taginfo: start_date, on 2010-11-10, showing severe heterogeneity.

See also

External links

HTML5 dates

Personal tools
Namespaces
Variants
Actions
site
Toolbox