Electrical Network
Generation capacity2,626 MW (OSM)
Power line length8,319 km (OSM)
Frequency... Hz
Transmission lines voltages (kV)...
Data from Wikidata (last update 2025-05-17)
and OpenInfraMap (last update 2025-04-27)

This page has been created through the power networks country page template. Check the template page for more information on how to complete it.

High-voltage Electrical Network

State of the map

In 2025-03:

Network description

Voltages and frequency

Frequency : TODO Hz

Network Voltage Comments Appearance
Transmission 500 kV
Transmission 220 kV
Transmission 115 kV
Transmission TODO ?


Operators

Operator Network Wikidata Website Wikipedia Operating area Information Label Taginfo
TODO Transmission Q99999
WhatLinksHere
TODO TODO operator=TODO
operator:wikidata=Q99999
operator=TODO

Interconnections

Neighbour country Structure name Year of commissioning Technology Voltage Local end Foreign end OSM circuit Notes
TODO xxx

Planned projects

  • ...

Data Sources

Source License Date Suitable for OSM Notes
https://www.cndc.bo/media/archivos/normas/Instructivos_de_Restitucion_del_SIN.pdf ? ? ?? -
https://fr.scribd.com/document/425875074/Subestaciones-en-Bolivia ? ? ?? -
Transmission grid map ? 2023 ?? -


Network statistics

Bolivia has 57 power plants totalling 2,626 MW and 8,319 km of power lines mapped on OpenStreetMap (from OpenInfraMap, last update 2025-04-27)

Power line

Power Lines Voltage Length
From OpenInfraMap, last update 2025-04-27
< 10 kV 0 km
10 kV - 25 kV 0 km
25 kV - 52 kV 19 km
52 kV - 132 kV 3,531 km
132 kV - 220 kV 46 km
220 kV - 330 kV 3,644 km
330 kV - 550 kV 235 km
> 550 kV 0 km
No voltage tagged 842 km
Total 8,319 km

Electricity generation

Mapping process and community

Mapping success stories

Success stories are designed to highlight important contributions. Have you significantly improved the cartography of a country (added a new line, a power station, etc.)? Don't be shy, let us know below.

  • Andreas [2025-03]: The only current 500kv line in Bolivia was finalised and connected.
  • Andreas [2025-03]: Many 115kv lines were mapped and corrected, and a 220kv line was connected.
  • Andreas [2025-03]: A geojson hint layer official source was found, and helped mapping all major transmission lines until 2024.
  • Andreas [2025-03]: Two in construction hydropower plants with total capacity of 300MW were found or correctly tagged

Encountered problems and places to improve

  • Andreas [2025-03]: Satellite images were of good quality on bing imagery and sometimes Esri but slightly outdated. Many 2024 real-life developments could not be seen.
  • Andreas [2025-03]: Once satellite data is available, a 220kv line could be finished and connected in the East.
  • Andreas [2025-03]: A 115kv line in the South could be mapped once satellite data is better.

Use of mapping strategies

Mapping strategies refer to Power networks/Guidelines#Mapping strategies. They are used for a methodical improvement of the OSM database. Once you have fully applied a strategy in this country, you should add or update your name, the date, the strategy, and a comment below. This way, other users can see whether it is worthwhile to carry out further investigations.

  • Search for "Unfinished major power lines" - last time applied by Andreas [2025-03]
  • Searching for power plant connection - last time applied by Andreas [2025-03]
  • Searching for substation connection - last time applied by Andreas [2025-03]
  • Searching for parallel lines - last time applied by Andreas [2025-03]
  • Identifying obvious gaps in the network topology from a national perspective - last time applied by Andreas [2025-03]
  • Identifying new substations and transmission lines - last time applied by Andreas [2025-03]